Secure Payment
Espresso Machines
Contact

Office  01302 856829

Mobile 07515 612181

email : info@espressorepair.co.uk

News & Offers

Espresso Machine Service

Keeping your machine running smoothly and satisfying the end users is of prime importance to us. Through a programme of pre planned service and maintenance we can help you reduce down time, extend the life of your machine and ensure improved customer satisfaction and loyalty.

Front End Service

Recomended every 8 – 12 months to keep your Espresso Machine in tip top condition!

Includes:-

  1. New group head seals & showers
  2. New group head valve o-rings
  3. Back flushing of group heads & staff training Striping & cleaning the level probe and re-setting the boiler water level
  4. Re-calibrating of the grinder and re-setting of the machine drink levels
  5. Advise on the general condition of the machine and any parts which may need replacing in the future.

 Enquire 

Full Machine Service (on site)

Recommended every 18 – 24 months (or if the machine has not been serviced for some time)

Includes: –

  1.  New group head seals & showers
  2. New group head valve o-rings New steam arm seals New steam / water valve seals
  3. Striping & cleaning the inside of the group head New group head filters 
  4. New group head jets New group head stems 
  5. Back flushing of group heads & staff training Striping & cleaning the level probe and re-setting the boiler water level 
  6. Re-calibrating of the grinder and re-setting of the machine drink levels 
  7. Advise on the general condition of the machine and any parts which may need replacing in the future 
  8. Cleaning kit (back flush plate, brush, powder)

 Enquire 

Full Machine Descale & Overhaul!

Recommended for machines which have not been serviced for 5 years or more or are having problems with scale build up

Includes: – 

  1. Full machine strip down to bare frame
  2. Descale of all brass pipes, boiler, group heads, steam/water valves 
  3. Full clean of frame & touch up paint work if needed 
  4. Re-build of machine replacing all seals
  5. New group head seals & showers 
  6. New group head valves 
  7. New steam arm seals 
  8. New steam / water valve seals
  9. New group head filters New group head jets 
  10. New group head stems 
  11. New anti vac valve 
  12. New boiler safety valve New pressure switch 
  13. New element gasket Re-calibration of the grinder and grinder plates replaced 
  14. Re-setting of machine drinks level 
  15. Basic training of staff Cleaning kit (back flush plate, brush, powder)

 Enquire